Preferred Power-on/off sequence

Forums Forums ME Forums ME general discussions Preferred Power-on/off sequence

This topic contains 0 replies, has 1 voice, and was last updated by Profile photo of  Anonymous 6 years, 11 months ago.

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #63188
    Profile photo of
    Anonymous

    Is there a preferred power-on and power-off sequence for a dLive Surface, MixRack, and ME-U that will help ensure all 16 channels on the ME-1 receive the correct signals and channel label info? A mystery occurred recently where the same two channels on all nine ME-1 units indicated “Not Assigned.” the i/o assignments have not be touched since original install of MixRack and Surface. Or am I dealing with a totally different issue? MixRack is running ver 1.41; ME-1s are running ver. 1.13.

Viewing 1 post (of 1 total)

You must be logged in to reply to this topic.